The end of 2016-the beginning of 2017 for FloorBest was marked by the installation of floor covering at the Metropolitan Andrey Sheptytsky Center. Construction began in the spring of 2015. And on Sunday, September 10, 2017, the solemn opening of the Metropolitan Andrey Sheptytsky Center. This is the first building in Ukraine during the time of independence, built specifically for the library.
Our specialists are equipped with a range of premium coverings, as: Desso carpet tiles, DLW natural linoleum, Nora rubber coatings, AMF suspended ceilings, Heradesign acoustic panels, Flotex carpeting.
For high-quality works performed by the Director and the FloorBest team, honors were signed by UCU President Bishop Boris and UCU rector of the B. Prakh.